WUHAN RADARKING ELECTRONICS CORP.

WUHAN RADARKING ELECTRONICS CORP. Electric Meter, Smart Water Meter, Smart Gas Meter & AMI solution

Manufacturer from China
Active Member
9 Years
Home / Products / Advanced Metering Infrastructure /

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

Contact Now
WUHAN RADARKING ELECTRONICS CORP.
City:wuhan
Province/State:hubei
Country/Region:china
Contact Person:MrsAda Yang
Contact Now

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

Ask Latest Price
Brand Name :Radarking
Model Number :RDK-CJQ
Certification :ISO9001, ISO4001
Place of Origin :Made in China
MOQ :1 nos
Price :Negotiate
Payment Terms :Western Union, L/C, T/T
Delivery Time :35 days
Packaging Details :Standard Package
Installation :Direct Connected
Communication :wifi/GPRS/RS485/Carrier Communication module
Voltage :220V/230V/240V
Frequency :50Hz/60Hz
Smart Meter :Electricity/Water/Gas Meter
Type :RDK-CJQ Data Collector
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description
Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

1. Product Description

Data Collector with RS485 interface for Smart Electricity Meter Power Grid System can support LV concentrator to complete the data communication channel switching for the smart energy meter of RS-485 communication method, guide rail mounted and compactable with hook mounted design, suitable for the applications where the meter box space is limited and requires only transparent data transmission.

2.Specification:

1 Operating Frequency Band 470MHz~510MHz / 223~ 230MHz Or Customized
2 Modulation GFSK / GMSK Configurable
3 Air Transmission Rate Default 10Kbps, 1.2Kbps~100Kbps Or Customized
4 ERP < 17dBm / 20dBm~30dBm
5 RX Sensitivity -116dBm(BER=0.1%,10Kbps)
6 Signal Level Range 3.3V / TTL Level / CMOS compatible
7 Air Baud Rate Default 10Kbps, 1.2Kbps~100Kbps Or Customized
8 Supply Voltage 220V AC -20%~+20% 50Hz,1.9times Standard voltage, no damage within 4 hours
9 Working Current Transmit Current≤100mA;Quiescent Current≤50mA
10 Serial Interface Data Bits 8;Even Parity Check, stop bit 1
11 Software Maintenance Wireless Smart Update
12 Bit Error Rate Less than 1%
13 Size Meet the China State Grid Regulation issued in May, 2013 Or Customized
14 Technical Regulation Meet the China State Grid Regulation issued in May, 2013 Or Customized


3. Technical Parameters:

1, Operating Power: AC220V±20%,50Hz(single Phase)

2,Static Power Consumption: ≤5W

3,Upward Communication Interface: Radio Frequency ≥300m (open field)

4,Downward Communication Interface: RS-485 bus line. M-BUS bus line, Radio frequency.

5,Operating Temperature: -25℃~+55℃

6,Relative Humidity: 5%~95% (non-condensate)

4. Installation Requirements:

  • Collector Installation Requirements:

4.1.1 Wall mounted, has three fixed holes, can be fixed on the wall surface.

4.1.2 Collector should be installed in the building, if outdoor installation, should configure the outdoor protective box, in avoid the direct sunlight and rain.

4.1.3 Collector should be installed the at the position which the meter is relatively concentrated.

4.1.4 The power supply of collector should be stable, in avoid the data can’t be collect caused by the power outage. The power line adopts the 2×0.5mm2 thickness or thicker wires, and install the earth-leakage protective device.

  • Antenna Installation Requirements:

4.2.1 The antenna will be installed at the outdoor or outdoor relative open position, and antenna is towards the concentrator.

4.2.2 The antenna will be within the scope of effective protection of lighting rod and will be more than 1.5 m below than lighting rod.

4.2.3 Install the corresponding frequency antenna according to the antenna terminal instruction on the collector case. Must guarantee the upward and downward antenna communication frequency, channel, concentrator, smart meter correspond strictly when installation. The communication frequency of sucker antenna will be checked the label at the bottom of antenna.

4.2.4 Antenna bracket fixed well, and the antenna base will be fixed firmly on the bracket. Tight the magnet part of antenna head, and also tight firmly the junction between the antenna and collector.

4.2.5 In order to avoid the antenna was surrounded by the metal objects. The antenna position should be far away from the air conditioner compressor, transformer, communication cable,etc.

Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication


Data Collector Advanced Metering Infrastructure with Power Supply Display PLC Communication

Inquiry Cart 0