WUHAN RADARKING ELECTRONICS CORP.

WUHAN RADARKING ELECTRONICS CORP. Electric Meter, Smart Water Meter, Smart Gas Meter & AMI solution

Manufacturer from China
Active Member
9 Years
Home / Products / Advanced Metering Infrastructure /

Data Collector Advanced Metering Infrastructure For Smart Meter Data Acquistion

Contact Now
WUHAN RADARKING ELECTRONICS CORP.
City:wuhan
Province/State:hubei
Country/Region:china
Contact Person:MrsAda Yang
Contact Now

Data Collector Advanced Metering Infrastructure For Smart Meter Data Acquistion

Ask Latest Price
Brand Name :Radarking
Model Number :DCZZ23-RDK150
Certification :ISO9001, ISO4001
Place of Origin :Made in China
MOQ :1 nos
Price :Negotiate
Payment Terms :Western Union, L/C, T/T
Delivery Time :35 days
Packaging Details :Standard Package
Name :Data Collector for Data Acquistion
Installation :Direct Connected
Communication :RS485/Carrier Communication solution
Voltage :220V
Frequency :50Hz
Smart Meter :Electricity/Water/Gas Meter
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Data Collector Advanced Metering Infrastructure For Smart Meter Data Acquistion

General

1. This product was powered by the AC 220V. Please operate strictly according to the related regulation and this manual when install and maintain. To prevent the injury because of electric shock.
2. The M-BUS communication cable, RS-485 communication cable and 220 power line will arrange wiring separately, to avoid any possible electrical connection to cause any accident.
3. It need to do the waterproof work when transportation, storage, installation, and operation. To avoid the water flow into the Collector and cause the personnel injury or the device damaged.
4. The power supply of Collector should be stable. To avoid the data can’t be collect caused by the power outage. And also install the earth-leakage protection device.
5. Need to avoid the short circuit and disconnection of M-BUS communication cable or RS-485 communication able when the Collector connect with meter. In order to prevent the system can’t operate normally.
6. The antenna will be within the scope of effective protection of lighting rod and will be more than 1.5 m below than lighting rod.
7. Please connect the matching antenna according to the antenna connection description. Need to avoid the different communication frequency antenna hybrid junction.
8. In order to avoid the antenna was surrounded by the metal objects. The antenna position should be far away from the air conditioner compressor, transformer, communication cable,etc.

Technical Parameters:

  • Operating Power: AC220V±20%,50Hz(single Phase)

  • Static Power Consumption: ≤5W

  • Upward Communication Interface: Radio Frequency ≥300m (open field)

  • Downward Communication Interface: RS-485 bus line. M-BUS bus line, Radio frequency.

  • Operating Temperature: -25℃~+55℃

  • Relative Humidity: 5%~95% (non-condensate)

Installation Requirements:

  • Wall mounted, has three fixed holes, can be fixed on the wall surface.
  • Collector should be installed in the building, if outdoor installation, should configure the outdoor protective box, in avoid the direct sunlight and rain.
  • Collector should be installed the at the position which the meter is relatively concentrated.
  • The power supply of collector should be stable, in avoid the data can’t be collect caused by the power outage. The power line adopts the 2×0.5mm2 thickness or thicker wires, and install the earth-leakage protective device.

Inquiry Cart 0